Walking around Stratford, today, it is hard to imagine that, up until twenty years ago, this was an area of London that was in dire need of regeneration.
Much of the area was derelict industrial wasteland, part of which was radioactive due to Queen Mary College's Department of Nuclear Engineering, having a small nuclear reactor onsite. Something needed to be done.
In 2001, following China's successful bid to host the 2008 Olympic Games, London put in a bid for the 2012 Olympic Games. Two plans were short-listed:
- West London - Based around Wembley and the construction of a new National Stadium to replace Wembley Stadium.
- East London - Involving the regeneration of an area stretching from the Isle of Dogs, through Stratford, and on into the Lower Lea Valley.
The second plan won unanimously and so became the pitch for the London bid.
In May 2005, London won the bid to host the 2012 Olympics.
Construction
In May 2008, after the 'bowl' of the stadium had been excavated and the area cleared, construction of the stadium began. It was due to be completed in May 2011, but was completed in March of 2011, coming in under budget and ahead of schedule.
The foundation consists of 5,000 piles, driven to a depth of 20 m (66 ft)
In October 2011, the athletics track was laid. The track-and-field area is surrounded by 25,000 permanent seats, built using concrete.
Spectators and visitors enter the stadium at the podium level, which is inline with the top of the permanent seating. This upper tier was built from lightweight steel and concrete and accommodated another 55,000 spectators. The upper tier is 60 m (197 ft) in height.